合肥生活安徽新聞合肥交通合肥房產生活服務合肥教育合肥招聘合肥旅游文化藝術合肥美食合肥地圖合肥社保合肥醫院企業服務合肥法律

        QBUS 6820代寫、代做Python編程設計
        QBUS 6820代寫、代做Python編程設計

        時間:2025-05-22  來源:合肥網hfw.cc  作者:hfw.cc 我要糾錯



        Prescriptive Analytics: From Data to Decision – QBUS 6820

        Semester 1, 2025

        Assignment 2

        Issued: 2 May 2025

        Submit date: Monday 19 May 2025 at 11:59pm

        All problems to be submitted for assessment (20%)

        Assignments must be typed. Handwritten assignments will not be accepted.

        Submission of assignments is strictly through Canvas

        For all the questions you are required to provide your Python Code (this can be done in

        an appendix).

        Question 1 (7 marks):

        The owner of a commercial building has decided to renovate her facility. She has identified

        the following activities that must be performed before she can reopen for business:

        Activity Description Duration (in days) Predecessor activities

        A New Plumbing 13

        --

        B Order/Rec Furniture 23

        --

        C Order/Rec Flooring 18

        --

        D Construct Partitions 8

        --

        E Paint & Wallpaper 8

        A, D

        F Install Furniture 6

        E, B

        G Install Flooring 7

        E, C

        H Move Inventory & Rec's 4

        F, G

        I Clean Old Shop 4

        H

        a. Draw the activity network for this problem (AON).

        b. Provide the earliest and latest start and finish times, the slack for each activity, and identify

        the critical activities (either on the network or in a table).

        c. What is the duration of the project? Provide the critical paths(s).

        d. Suppose that the owner has a binding contract stating that she must complete the

        renovation within 32 days. The normal and crash times and costs for each activity are

        summarized in the table below. Is it possible for her to complete the project within 20

        days? If it is possible, at what cost? If it is not possible, what is the earliest time she can

        complete the project and at what cost?

        Activity

        Normal Crash

        Time (days) Cost (dollars) Time (days) Cost (dollars)

        A 13

        11,000 10 15,000

        B 23

        5,000 21 6,000

        C 18

        3,000 15 3,500

        D 8

        1,500 6 2,000

        E 8

        750 5 1,200

        F 6

        600 4 1,200

        G 7

        1,000 5 1,500

        H 4

        250 3 450

        I 4 200 2 300

        Question 2 (6 marks)

        You are in charge of loading Cargo ships in Newcastle port. An agricultural commodities

        dealer wants to transport the following products aboard a ship:

        Commodity Amount available

        (tons)

        Volume per ton

        (cubic feet)

        Profits per ton ($)

        1 48 4 7

        2 30 2.5 5

        3 15 3 6

        4 18 4.5 8

        You can select to load any and/or all of the available commodities. However, the ship has

        three cargo holds with the following capacity restrictions:

        Cargo hold Weigh capacity (tons) Volume capacity

        (cubic feet)

        Forward 32 180

        Center 58 210

        Rear 40 160

        Only one type of commodity can be placed in any cargo hold (note that you can load the

        same commodity in different cargos). However, because of balance considerations, the

        weight in the forward cargo hold must be within 10% of the weight in the rear cargo hold

        (this means that if the weight in the rear cargo is 10 tons, then that of the front cargo has

        to be between 9 and 11 tons). In addition, the center cargo hold must be between 40% and

        60% of the total weight on board.

        Formulate an ILP model for the problem and solve it using Python.

        Question 1 (7 marks):

        A company needs to supply customers in 3 cities from its 3 warehouses.

        The supplies,

        demands and shipping costs (in dollars per unit) are shown below.

        Destination

        Warehouse 1 2 3 Supply

        1 34 60 36 400

        2 70 40 50 300

        3 56 40 32 200

        Demand 500 300 200

        The company has identified the following goals:

        Goal 1: The company would like to come as close as possible to satisfying its

        customers demand. It would also like to come as close as possible to using the

        warehouses supply.

        Goal 2: It would like to ensure that the cost is approximately $60,000.

        a. Formulate a goal programming model of this problem. Assume that your goal is to

        minimize the sum of percentage deviations from your goals. You should assume that

        warehouses hold 50 units of safety stock each (this means that they can use reserves

        to increase their supply by 50 units. For example, Warehouse 1 would ideally supply

        400 units, but can supply anywhere between 0 and 450 units).

        b. Solve the problem using Python. Provide the Python code and clearly state your

        solution.

        c. How would your answer change if Goal 2 changes to $30,000? No need to

        supply an addition Python code.

        請加QQ:99515681  郵箱:99515681@qq.com   WX:codinghelp

        掃一掃在手機打開當前頁
      1. 上一篇:QBUS6600代寫、Python/C++編程代做
      2. 下一篇:COMP30023代做、代寫C/C++編程語言
      3. 無相關信息
        合肥生活資訊

        合肥圖文信息
        急尋熱仿真分析?代做熱仿真服務+熱設計優化
        急尋熱仿真分析?代做熱仿真服務+熱設計優化
        出評 開團工具
        出評 開團工具
        挖掘機濾芯提升發動機性能
        挖掘機濾芯提升發動機性能
        海信羅馬假日洗衣機亮相AWE  復古美學與現代科技完美結合
        海信羅馬假日洗衣機亮相AWE 復古美學與現代
        合肥機場巴士4號線
        合肥機場巴士4號線
        合肥機場巴士3號線
        合肥機場巴士3號線
        合肥機場巴士2號線
        合肥機場巴士2號線
        合肥機場巴士1號線
        合肥機場巴士1號線
      4. 短信驗證碼 酒店vi設計 NBA直播 幣安下載

        關于我們 | 打賞支持 | 廣告服務 | 聯系我們 | 網站地圖 | 免責聲明 | 幫助中心 | 友情鏈接 |

        Copyright © 2025 hfw.cc Inc. All Rights Reserved. 合肥網 版權所有
        ICP備06013414號-3 公安備 42010502001045

        主站蜘蛛池模板: 无码欧精品亚洲日韩一区夜夜嗨| 中文字幕精品一区二区2021年 | 精品人妻一区二区三区浪潮在线| 麻豆一区二区在我观看| 亚洲福利视频一区二区三区| 国产一区二区三区亚洲综合| 亚洲香蕉久久一区二区三区四区| 天堂不卡一区二区视频在线观看| 精品无码人妻一区二区免费蜜桃| 精品国产毛片一区二区无码| 无码aⅴ精品一区二区三区| 国产av熟女一区二区三区| 亲子乱av一区二区三区| 日韩精品福利视频一区二区三区| 一区二区三区无码高清| 78成人精品电影在线播放日韩精品电影一区亚洲 | 国产一区二区三区精品视频| 一区二区在线播放视频| 国产主播一区二区三区在线观看 | 久久久久成人精品一区二区 | 中文字幕aⅴ人妻一区二区| 日韩在线视频一区二区三区| 无码人妻一区二区三区免费| 老熟女高潮一区二区三区| 国产精品无圣光一区二区| 无码少妇一区二区性色AV | 国产精品亚洲综合一区在线观看| 国产成人精品第一区二区| 黑人大战亚洲人精品一区| 成人h动漫精品一区二区无码| 最新中文字幕一区二区乱码| 午夜性色一区二区三区不卡视频| 国产一区二区在线观看视频| 国产AⅤ精品一区二区三区久久| 99久久精品费精品国产一区二区| 蜜桃视频一区二区三区在线观看 | 亚洲综合色自拍一区| 精品成人乱色一区二区| 性色AV 一区二区三区| 久久无码人妻一区二区三区 | 国产日韩精品一区二区三区在线|