        DMS2030

        Individual Assignment 1

        Due Date: 11:59 pm, October 14th, 2024

        1. A fertilizer company from San Diego has provided the following data.

         

        Last Year ($)

        This Year ($)

        Sales

        23,000

        34,000

        Labor

        10,000

        16,000

        Raw Material

        8,000

        10,000

        Capital Equipment

        2,000

        4,000

        (a) Compute the labor, raw material, and total productivity for each year. (5 points)

        (b) Compute the overall labor, raw material, and total productivity for the two years. (5 points)

        2. The inventory of a supermarket turns 46 times a year. The manager of the supermarket says that everything that the store receives from vendors is, on average, sold in two weeks. Are these statements consistent? Assume there are 52 weeks in a year. (5 points)

        3. A truck rental company serves 30 rental requests per week on average.  Each truck on average is rented for 3 weeks. The rental fee is $1,000 per truck per week. How many trucks are on renton average?  What is the average weekly revenue? (5 points)

        4. A hospital emergency room (ER) is currently organized so that all patients register through an initial check-in process. At his or her turn, each patient is seen by a doctor and then exits the process, either with a prescription or with admission to the hospital. Currently, 55 people per hour arrive at the ER, 10% of who are admitted to the  hospital. On average, 7  people are waiting to  be  registered and  34  are registered and waiting to see a doctor. The registration process takes, on average, 2 minutes per patient. Among patients who receive prescriptions, average time spent with a doctor is 5 minutes. Among those admitted to the hospital, average time is 30 minutes. On average, how long does a patient spend in the ER? On average, how many patients are being examined by doctors? On average, how many patients are there in the ER? Assume the process to be stable; that is, average inflow rate equals average outflow rate.

        Please refer to the diagram next page.

         

        (a) On average, how long does a patient spend in the ER? (5 points)

        (b) On average, how many patients are being examined by doctors? (5 points)

        (c) On average, how many patients are there in the ER? (5 points)

        Note: In the last stage (seeing a doctor), there are two types of patients,i.e. two types of flows. When you consider the average time in the last stage, you should take the weighted average because these two types of patients have different measures.

        5. Elaine owns a computer rental store.  The rental process can be depicted by the following process flow diagram.

         

        Return rate R

        Customer arrivals to the store with an average rate of R = 20 per week and each customer requests for one computer. The rental time is 3 weeks on average. The rental fee is $300 per week. At the end of the rental  period, the customer returns his/her rented  computer to the store. Elaine will inspect every returned computer. The inspection time is negligible. On average 10% of the returned computers need to be repaired by a technician (repair actually means re-configuration and minor repair). A computer that needs repair spends an average time of 1 week in the repair stage, including waiting and repair. After repair work is completed, the computer will be put into the stock for rental. Returned computers that don’t need repair will  be put immediately into the stock for rental. To ensure that there are always computers available to satisfy customer requests, Elaine has to keep an average of 10 computers in the stock for rental.

        (a) What is the total number of computers that Elaine needs for her rental business? (5 points)

        (b) With an average of 10 computers in the stock for rental, on average how much time does a computer spend in the stock for rental before it is rented by a customer? (5 points)

        (c) Elaine estimates that the average rental time will become 2 weeks if she increases the rental fee to $500 per week. The customer arrival rate, the repair time and the percentage of returned computers that need repair will remain the same. Again, she needs to have an average of 10 computers in the stock for rental. Should she increase the rental fee? Justify your answer by considering the number of computers required and the expected revenue per week. (5 points)

        6. Bandai has a production line which produces Doraemon toys. There are three steps: in the molding step, workers transfer plastic into the white figures; in the painting step, worker transfer the white figures into painted figures; in the packing step, workers transfer the painted figures into final boxed toys. Currently, the number of workers and the time needed for each step is listed as follows:

        Step

        Number of Workers

        Time Needed (per Unit per Worker)

        Molding

        5

        5 min

        Painting

        8

        10 min

        Packing

        4

        2 min

        (a) Draw a flowchart to depict the toy production process. (5 points) (b) What is the bottleneck of the process? (5 points)

        (c) Suppose the demand for toys is 60 units per hour. What is the flow rate of the process? What is the capacity utilization for each step? What is the implied utilization for each step? (5 points)

        (d) Bandai plans to hire 17 new workers for the Doraemon production line. How should Bandai train and allocate these workers to different steps in order to maximize the capability of the production line? What if there are 34 new workers? (5 points)

        7. Vernon, Andy, and Sean are getting ready for their last period in the exchange study in CBS. Following the final exams, they intend to throw a big party with many of their friends from back home. Presently, they have identified the following set of activities that need to be completed. They decide to not spend any work on preparing the party until all final exams are over. Moreover, they aim to spend a 3-day beach vacation as early as possible, but not before all party planning activities are completed.

        On June 10, they will enter the final exam week, which will take 5 days. They then want to arrange for live music (which will take 5 days), evaluate a number of potential party sites (6 days), and prepare a guest list, which includes inviting their friends and receiving the RSVPs (7 days).  They want to visit their two most promising party sites, which they expect to take 4 days. However, this can only be done once they have completed the list of party sites. Once they have finished the guest list and received the RSVPs, they want to book hotel rooms for their friends and created a customized T-shirt with their names on it as well as the name of the guest. Hotel room reservation (3 days) and T-shirt creation (6 days) are independent from each other, but both of them require the guest list to be completed. Once they have picked the party site, they want to have a meeting onsite with an event planner, which they expect to take 4 days. And then, once all work is completed, they plan to takeoff to the beach.

        (a) Draw a table to list all the activities, their immediate predecessors, and their durations. Draw the network based on the table. (5 points)

        (b) What is the critical path? (5 points)

        (c) For each activity, compute the slack time. (5 points)

        8. The following table represents a project that should be scheduled using CPM:

         

         

        Time (Days)

        Activity

        Immediate Predecessors

        Optimistic

        Most Likely

        Pessimistic

        A

        -

        1

        3

        5

        B

        -

        1

        2

        3

        C

        A

        1

        2

        3

        D

        A

        2

        3

        4

        E

        B

        3

        4

        11

        F

        C, D

        3

        4

        5

        G

        D, E

        1

        4

        6

        H

        F, G

        2

        4

        5

        (a) Draw the network. (5 points)

        (b) What is the critical path? (5 points)

        (c) What is the probability of completing this project within 16 days? (5 points)

        9. Any suggestions/comments for the class so far? (Optional)


        請加QQ:99515681  郵箱:99515681@qq.com   WX:codinghelp






         

        掃一掃在手機打開當前頁
      1. 上一篇:代寫COMP3013、代做C/C++,Python語言程序
      2. 下一篇:代寫22753 Cost Management and Analysis
      3. 無相關信息
        合肥生活資訊

        合肥圖文信息
        急尋熱仿真分析?代做熱仿真服務+熱設計優化
        急尋熱仿真分析?代做熱仿真服務+熱設計優化
        出評 開團工具
        出評 開團工具
        挖掘機濾芯提升發動機性能
        挖掘機濾芯提升發動機性能
        海信羅馬假日洗衣機亮相AWE  復古美學與現代科技完美結合
        海信羅馬假日洗衣機亮相AWE 復古美學與現代
        合肥機場巴士4號線
        合肥機場巴士4號線
        合肥機場巴士3號線
        合肥機場巴士3號線
        合肥機場巴士2號線
        合肥機場巴士2號線
        合肥機場巴士1號線
        合肥機場巴士1號線
      4. 短信驗證碼 酒店vi設計 deepseek 幣安下載 AI生圖 AI寫作 aippt AI生成PPT

        關于我們 | 打賞支持 | 廣告服務 | 聯系我們 | 網站地圖 | 免責聲明 | 幫助中心 | 友情鏈接 |

        Copyright © 2025 hfw.cc Inc. All Rights Reserved. 合肥網 版權所有
        ICP備06013414號-3 公安備 42010502001045

        主站蜘蛛池模板: 国产精品伦子一区二区三区| 日韩福利视频一区| 精品视频一区在线观看| 久久精品一区二区东京热| 日韩高清一区二区| 久久精品日韩一区国产二区| 无码人妻少妇色欲AV一区二区| 美女视频黄a视频全免费网站一区| 91精品福利一区二区三区野战| 日本大香伊一区二区三区| 国产激情一区二区三区 | 视频一区二区三区免费观看| 日韩在线视频一区二区三区 | 国产日韩一区二区三免费高清| 国产剧情一区二区| 日本一区高清视频| 天天躁日日躁狠狠躁一区| 麻豆国产在线不卡一区二区| 亚洲AV成人精品日韩一区| 精品一区二区三人妻视频| 国产电影一区二区| 精品无码综合一区二区三区| 国产精品视频一区二区三区经| 精品一区精品二区制服| 91一区二区三区四区五区| 精品无码AV一区二区三区不卡| 亚洲国产精品第一区二区| 69福利视频一区二区| 极品人妻少妇一区二区三区| 国产精品福利一区二区| 亚洲国产欧美日韩精品一区二区三区 | 日本在线一区二区| 国产a∨精品一区二区三区不卡| 人妻天天爽夜夜爽一区二区| 在线观看一区二区三区av| 国产精品一区二区四区| 国模吧无码一区二区三区| 无码视频一区二区三区在线观看| 99精品一区二区免费视频| 国产精品视频一区| 国产精品成人一区二区|